1,washer and shaft are inserted in the mould for the seal consisting of the material listed
in the tab chart and become integral parts of the lever in the moulding process
2,prat no . is to appear in area shown.lettering to be .062 high gohic raised .015/.010 aboye
surface .last two digits to be inserted
3,indicated dims to be symmetric to centerline of shaft within .010 when shaft is fixtured 90
to washer surface
4,check seal integrity using z75-3278-00 and f39-1526-00
5,rubber flash not to exceed indicated lengths
6,vendor to supply test data as indicated on the material chart by "*" symbol from samples
molded under ideal conditions taken from each raw material batch .each shipment of parts will
reference a raw material batch number and contain those test results.these test results must
comply with the requirements of the tab chart indicated by a
7,vendor to supply raw material certifications with each shipment
8,if the vendor reclaims a pequired of scrap metal parts for use in his production
facility,the vendor is prohibited from using any heat type cleaning process in the reclaiming
process that could expose the specified material properties
9,the over-mould vendor is required to keep on file at his facility the certifications for
the subcomponents of the complete assembly.system sensor may request copies of these
certifications at any time
10,the following information must appear on shipping carton surface:
a,supplier name and address
b,part description
c,po#
d,customer part #
e,material description
f,quantity in box
g,date
11,when a reject concition occurs for the component indicated on this print and it is
mutually agreed that the nonconformence is the supplier's fault the supplier must provide in
writing to the quality manager a root cause and corrective action report.this report must be
supplied within 2 weeks of the date that the reject condition was confirmed
[此贴子已经被作者于2004-11-27 9:17:50编辑过]
|