There is a flange on the part that is missing from the mold. The flange should be in the Core insert.
Use ejector bars to help eject the part from the Core Insert.这里的FLANGE指的是什么啊?这句话是什么意思啊?请帮帮忙,着急!!!
Flip the water lines in the cavity around and have them go through the side of the mold. Place them about
every 3" apart and add recess pockets for the connectors.还有,这句话应该怎么翻译啊?运水到底是怎么走的?是每条运水之间相隔3英寸吗?能看出有多少条吗?
<DIV class=quote><B>以下是引用<I>小莲子</I>在2005-4-1 14:14:22的发言:</B>
There is a flange on the part that is missing from the mold. The flange should be in the Core insert.
Use ejector bars to help eject the part from the Core Insert.这里的FLANGE指的是什么啊?这句话是什么意思啊?请帮帮忙,着急!!!</DIV>
<P>这里指的是一个凸缘,可能是在镶块里面,脱不了模,需要特别加一个顶出装置</P>
<DIV class=quote><B>以下是引用<I>小莲子</I>在2005-4-1 14:19:22的发言:</B>
Flip the water lines in the cavity around and have them go through the side of the mold. Place them about
every 3" apart and add recess pockets for the connectors.还有,这句话应该怎么翻译啊?运水到底是怎么走的?是每条运水之间相隔3英寸吗?能看出有多少条吗?
</DIV>
<P> in the cavity around and have them go through the side of the mold在型腔周围通过模具边缘,(水路都是这样,从模具侧边穿孔,再用铜棒之类的东西塞上)</P>
<P> Place them about every 3" apart and add recess pockets for the connectors</P>
<P>水路间隔3英寸,并且在(水路)连接的地方预留一个凹槽(装连接器用的)</P>